The Peninsular Division of the Federal Electricity Commission (CFE) reported that today, Friday, April 28, it will cut power in Yucatan, Campeche, and Quintana Roo due to maintenance works on the power grid.
On its website, CFE clarified that it is not a “blackout”, but 8 scheduled maintenance works on the electrical network in the Yucatan Peninsula.
This time there are 4 maintenance works in Campeche, 3 in Yucatan and 1 in Quintana Roo, which will take a few hours in the morning and early in the afternoon.
The parastatal company will carry out work today in the following places:
Yucatan
Calle 2-C between 67 and 67-A, Francisco Villa Oriente, in Mérida, from 8:00 a.m. to 2:00 p.m.
Calle 5 No. 89, Colonia México, in Mérida, from 8:00 a.m. to 2:00 p.m.
Calle 67 between 128 and 128-B, Bosques del Poniente, in Mérida, from 8:00 a.m. to 2:00 p.m.
Quintana Roo
Avenida 27 with calle 30-B, in Bacalar, from 08:30 a.m. to 03:00 p.m.
Campeche
Calle Benito Juárez between Emiliano Zapata and Venustiano Carranza, in San Francisco Campeche, from 8:00 a.m. to 2:00 p.m.
Andador Los Naranjos between Belén Norte and Andador Los Ciruelos, from Fovisste Belén, in San Francisco Campeche, from 8:00 a.m. to 2:30 p.m.
Panama Street by Veracruz Street, Santa Ana neighborhood, in San Francisco Campeche, from 8:00 a.m. to 4:00 p.m.
Source: Diario de Yucatan